RFI Volume 3 – A.2.1 Route Selection Report (RSR)
Home | Further Information | Volume 1 | Volume 2 | Volume 3 | Volume 4 |
RSR Volume 1 – Report
Route Selection Report - Part 1
Route Selection Report - Part 2
RSR Volume 2
Volume 2 Figures Table of Contents | Table of Contents |
3.2.6 |
AADT Locations Red Option |
3.2.7 |
AADT Locations Orange Option |
3.2.8 |
AADT Locations Yellow Option |
3.2.9 |
AADT Locations Blue Option |
3.2.10 |
AADT Locations Pink Option |
3.2.11 |
AADT Locations Green Option |
4.1 | Overall Key Plan - Constraints Study Area |
4.3.1 | Designated Sites for Nature Conservation (1 of 2) |
4.3.2 | Designated Sites for Nature Conservation (2 of 2) |
4.3.3 | Ecological Habitat Survey Site Locations |
4.3.4 | Rare and/or Protected Plant Species Locations |
4.3.5 | Annex I Habitat Map (1 of 2) |
4.3.6 | Annex I Habitat Map (2 of 2) |
4.3.7 | Habitat Map (1 of 2) |
4.3.8 | Habitat Map (2 of 2) |
4.3.9 | Ecological Importance of Habitat (1 of 2) |
4.3.10 | Ecological Importance of Habitat (2 of 2) |
4.3.11 | Bat Survey Site Locations |
4.3.12 | Lesser Horseshoe Bat Survey Results |
4.3.13 | Daubenton's Bat & Leisler’s Bat Survey Results |
4.3.14 | Whiskered Bat & Natter's Bat Survey Results |
4.3.15 | Common Pipistrelle & Soprano Pipistrelle Bat Survey Results |
4.3.16 | Nathusius’s Pipistrelle, Unidentified Myotis Species and Brown Long-eared Bat Survey Results |
4.3.17 | Otter Survey Study Area & Results |
4.3.18 | White - clawed Crayfish Survey Site Locations |
4.3.19 | Molluscan Survey Site Locations |
4.3.20 | Marsh Fritillary Survey Site Locations and Results |
4.3.21 | Red Grouse Survey Site Locations and Survey Results |
4.3.22 | Barn Owl Survey Results and Raptor Records |
4.3.23 | Wintering Bird Survey Sites |
4.4.1 | Soils and Geology Unique Constraints Sheet 1 of 2 |
4.4.2 | Soils and Geology Unique Constraints Sheet 2 of 2 |
4.4.3 | Soils and Geology Constraints - Solid Geology |
4.4.4 |
Soils and Geology Constraints - Soils Map |
4.4.5 | Soils and Geology Constraints - Subsoils |
4.4.6 | Soils and Geology Constraints - Soft Compressible Ground |
4.4.7 | Soils and Geology Constraints - Karst Features Sheet 1 of 2 |
4.4.8 | Soils and Geology Constraints - Karst Features Sheet 2 of 2 |
4.4.9 | Soils and Geology Constraints - Quarries and Mineral Resources |
4.4.10 | Soils and Geology Constraints - Licenced Industrial Facilities |
4.4.11 | Soils and Geology Constraints - Geological Heritage |
4.5.1 | Hydrogeology Constraints Overall Mapping - Sheet 1 of 2 |
4.5.2 | Hydrogeology Constraints Overall Mapping - Sheet 2 of 2 |
4.5.3 | Hydrogeology Constraints - Aquifer Classification |
4.5.4 |
Hydrogeology Constraints - Aquifer Vulnerability |
4.5.5 | Hydrogeology Constraints - Hydroecological Sites (Sheet 1 of 2) |
4.5.6 | Hydrogeology Constraints - Hydroecological Sites (Sheet 2 of 2) |
4.5.7 | Hydrogeology Constraints - Abstraction Supply Wells |
4.6.1 | Hydrology Constraints - Drainage Catchments/Sub-catchments |
4.6.2 | Hydrology Constraints - Flood Risk Mapping - Pluvial & Groundwater |
4.6.3 | Hydrology Constraints - Flood Risk Mapping - Fluvial & Coastal |
4.7.1 & 4.7.2 | Landscape and Visual Constraints Sheets 1 & 2 |
4.9.1 | Land Use & Planning Constraints |
4.9.2 | Land Use & Planning Constraints Proposed Developments 1 of 2 |
4.9.3 | Land Use & Planning Constraints Proposed Developments 2 of 2 |
4.9.4 | Land Use & Planning Constraints Planning Applications |
4.9.5 | Land Use & Planning Constraints - Future Cycling/Pedestrian Networks |
4.10.1 | Engineering Constraints - Existing Infrastructure |
4.10.2 | Engineering Constraints - Bus Networks |
4.11.1 - 4.11.6 | Archaeological, Architectural and Cultural Heritage Constraints 1 to 6 |
4.12.1 | Material Assets - Agricultural Constraints |
4.13.1 | Material Assets Non-Agricultural Constraints |
4.13.2.1 & 4.13.2.2 | Material Assets Non-Agricultural - Existing Drainage Networks & Public Watermains 1 to 2 |
4.13.3.1 & 4.13.3.2 | Material Assets Non-Agricultural - Existing Utility Networks: Bord Gáis, ESB, SSE 1 to 2 |
4.13.4.1 & 4.13.4.2 | Material Assets Non-Agricultural - Existing Utility Networks - UPC, E-Net, Eircom, BT, Three. 1 to 2 |
4.13.5 | Waste Facility Constraints |
4.15.1 | Noise & Vibration and Air Quality & Climate Constraints |
4.15.2 | Galway City Council Lden Noise Map (2013 to 2018) |
4.15.3 | Galway City Council Lnight Noise Plan (2013 to 2018) |
4.16.1 | Human Beings Constraints |
5.3.1.1 - 5.3.1.3 |
1st Environmental Workshop Record Sheets 1 to 3 |
5.3.2 | Option Development Zones |
5.3.3 | 2006 Galway City Outer Bypass with Habitat Mapping |
5.3.4 | Cyan Route Option with Habitat Mapping |
5.3.4.1 - 5.3.4.3 | 2nd Environmental Workshop Record Sheets 1 to 3 |
5.3.5.1 - 5.3.5.3 | 3rd Environmental Workshop Record Sheets 1 to 3 |
6.1.1 | Stage 1 Route Options Plan Layout |
6.1.2 | Stage 1 Route Options Schematic |
6.3.1.0 | Online Route Option: RED Mainline Plan/Profile Key Plan |
6.3.1.1 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 1 of 9 |
6.3.1.2 | Online Route Option: RED Mainline CH 1+650 to CH 3+300 Sheet 2 of 9 |
6.3.1.3 | Online Route Option: RED Mainline CH 3+300 to CH 4+950 Sheet 3 of 9 |
6.3.1.4 | Online Route Option: RED Mainline CH 4+950 to CH 6+660 Sheet 4 of 9 |
6.3.1.5 | Online Route Option: RED Mainline CH 6+600 to CH 8+200 Sheet 5 of 9 |
6.3.1.6 | Online Route Option: RED Mainline CH 8+200 to CH 9+850 Sheet 6 of 9 |
6.3.1.7 | Online Route Option: RED Mainline CH 9+850 to CH 11+600 Sheet 7 of 9 |
6.3.1.8 | Online Route Option: RED Mainline CH 11+600 to CH 13+300 Sheet 8 of 9 |
6.3.1.9 | Online Route Option: RED Mainline CH 13+300 to CH 15+058 Sheet 9 of 9 |
6.3.2.0 | Stage 1 Orange Route Option - Mainline Plan/Profile Keyplan |
6.3.2.1 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 1 of 9 |
6.3.2.2 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 2 of 9 |
6.3.2.3 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 3 of 9 |
6.3.2.4 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 4 of 9 |
6.3.2.5 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 5 of 9 |
6.3.2.6 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 6 of 9 |
6.3.3.7 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 7 of 9 |
6.3.2.8 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 8 of 9 |
6.3.2.9 | Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 9 of 9 |
6.3.3.0 | Stage 1 Yellow Route Option - Mainline Plan/Profile Keyplan |
6.3.3.1 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 1 of 11 |
6.3.3.2 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 2 of 11 |
6.3.3.3 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 3 of 11 |
6.3.3.4 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 4 of 11 |
6.3.3.5 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 5 of 11 |
6.3.3.6 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 6 of 11 |
6.3.3.7 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 7 of 11 |
6.3.3.8 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 8 of 11 |
6.3.3.9 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 9 of 11 |
6.3.3.10 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 10 of 11 |
6.3.3.11 | Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 11 of 11 |
6.3.4.0 | Stage 1 Blue Route Option - Mainline Plan/Profile Keyplan |
6.3.4.1 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 1 of 10 |
6.3.4.2 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 2 of 10 |
6.3.4.3 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 3 of 10 |
6.3.4.4 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 4 of 10 |
6.3.4.5 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 5 of 10 |
6.3.4.6 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 6 of 10 |
6.3.4.7 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 7 of 10 |
6.3.4.8 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 8 of 10 |
6.3.4.9 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 9 of 10 |
6.3.4.10 | Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 10 of 10 |
6.3.5.0 | Stage 1 Pink Route Option - Mainline Plan/Profile Keyplan |
6.3.5.1 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 1 of 10 |
6.3.5.2 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 2 of 10 |
6.3.5.3 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 3 of 10 |
6.3.5.4 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 4 of 10 |
6.3.5.5 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 5 of 10 |
6.3.5.6 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 6 of 10 |
6.3.5.7 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 7 of 10 |
6.3.5.8 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 8 of 10 |
6.3.5.9 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 9 of 10 |
6.3.5.10 | Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 10 of 10 |
6.3.6.0 | Stage 1 Green Route Option - Mainline Plan/Profile Keyplan |
6.3.6.1 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 1 of 13 |
6.3.6.2 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 2 of 13 |
6.3.6.3 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 3 of 13 |
6.3.6.4 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 4 of 13 |
6.3.6.5 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 5 of 13 |
6.3.6.6 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 6 of 13 |
6.3.6.7 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 7 of 13 |
6.3.6.8 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 8 of 13 |
6.3.6.9 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 9 of 13 |
6.3.6.10 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 10 of 13 |
6.3.6.11 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 11 of 13 |
6.3.6.12 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 12 of 13 |
6.3.6.13 | Stage 1 Green Route Option - Mainline Plan/Profile Sheet 13 of 13 |
6.5.5.1 | Stage 1 Route Options and Annex I Habitats Sheet 1 of 8 |
6.5.1.2 | Stage 1 Route Options and Annex I Habitats Sheet 2 of 8 |
6.5.1.3 | Stage 1 Route Options and Annex I Habitats Sheet 3 of 8 |
6.5.1.4 | Stage 1 Route Options and Annex I Habitats Sheet 4 of 8 |
6.5.1.5 | Stage 1 Route Options and Annex I Habitats Sheet 5 of 8 |
6.5.1.6 | Stage 1 Route Options and Annex I Habitats Sheet 6 of 8 |
6.5.1.7 | Stage 1 Route Options and Annex I Habitats Sheet 7 of 8 |
6.5.1.8 | Stage 1 Route Options and Annex I Habitats Sheet 8 of 8 |
6.5.1.9 | Stage 1 Route Options and Bat Survey Results Sheet 1 of 4 |
6.5.1.10 | Stage 1 Route Options and Bat Survey Results Sheet 2 of 4 |
6.5.1.11 | Stage 1 Route Options and Bat Survey Results Sheet 3 of 4 |
6.5.1.12 | Stage 1 Route Options and Bat Survey Results Sheet 4 of 4 |
6.5.1.13 | Stage 1 Route Options with Protected Flora and Fauna Species Sheet 1 of 4 |
6.5.1.14 | Stage 1 Route Options with Protected Flora and Fauna Species Sheet 2 of 4 |
6.5.1.15 | Stage 1 Route Options with Protected Flora and Fauna Species Sheet 3 of 4 |
6.5.1.16 | Stage 1 Route Options with Protected Flora and Fauna Species Sheet 4 of 4 |
6.5.1.17 | Stage 1 Route Options and Annex I Habitats at Lough Corrib cSAC Crossing Sheet 1 of 2 |
6.5.1.18 | Stage 1 Route Options and Annex I Habitats at Lough Corrib cSAC Crossing Sheet 2 of 2 |
6.5.1.19 | Stage 1 Route Options with Wintering Bird Survey Sites Sheet 1 of 2 |
6.5.1.20 | Stage 1 Route Options with Wintering Bird Survey Sites Sheet 2 of 2 |
6.5.2.1 | Stage 1 Route Options with Soils & Geology Unique Constraints Sheet 1 of 2 |
6.5.2.2 | Stage 1 Route Options with Soils & Geology Unique Constraints Sheet 2 of 2 |
6.5.2.3 | Stage 1 Route Options with Solid Geology Sheet 1 of 2 |
6.5.2.4 | Stage 1 Route Options with Solid Geology Sheet 2 of 2 |
6.5.2.5 | Stage 1 Route Options with Soils Mapping Sheet 1 of 2 |
6.5.2.6 | Stage 1 Route Options with Soils Mapping Sheet 2 of 2 |
6.5.2.7 | Stage 1 Route Options with Subsoils Mapping Sheet 1 of 2 |
6.5.2.8 | Stage 1 Route Options with Subsoils Mapping Sheet 2 of 2 |
6.5.2.9 | Stage 1 Route Options with Soft Compressible Ground Sheet 1 of 2 |
6.5.2.10 | Stage 1 Route Options with Soft Compressible Ground Sheet 2 of 2 |
6.5.2.11 | Stage 1 Route Options with Principal Cuttings & Embankments Sheet 1 of 2 |
6.5.2.12 | Stage 1 Route Options with Principal Cuttings & Embankments Sheet 2 of 2 |
6.5.3.1 | Stage 1 Route Options with Hydrogeology Constraints Sheet 1 of 2 |
6.5.3.2 | Stage 1 Route Options with Hydrogeology Constraints Sheet 2 of 2 |
6.5.4.1 | Stage 1 Route Options with Hydrology Constraints – Drainage Catchments Sheet 1 of 2 |
6.5.4.2 | Stage 1 Route Options with Hydrology Constraints – Drainage Catchments Sheet 2 of 2 |
6.5.4.3 | Stage 1 Route Options with Flood Risk Mapping Pluvial & Groundwater Sheet 1 of 2 |
6.5.4.4 | Stage 1 Route Options with Flood Risk Mapping Pluvial & Groundwater Sheet |
6.5.4.5 | Stage 1 Route Options with Flood Risk Mapping Fluvial & Coastal Sheet 1 of 2 |
6.5.4.6 | Stage 1 Route Options with Flood Risk Mapping Fluvial & Coastal Sheet 2 of 2 |
6.5.5.1 | Stage 1 Red Route Option with Landscape and Visual Assessment |
6.5.5.2 | Stage 1 Red Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
6.5.5.3 | Stage 1 Orange Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
6.5.5.4 | Stage 1 Orange Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
6.5.5.5 | Stage 1 Yellow Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
6.5.5.6 | Stage 1 Yellow Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
6.5.5.7 | Stage 1 Blue Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
6.5.5.8 | Stage 1 Blue Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
6.5.5.9 | Stage 1 Pink Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
6.5.5.10 | Stage 1 Pink Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
6.5.5.11 | Stage 1 Green Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
6.5.5.12 | Stage 1 Green Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
6.5.6.1 | Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 1 of 6 |
6.5.6.2 | Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 2 of 6 |
6.5.6.3 | Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 3 of 6 |
6.5.6.4 | Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 4 of 6 |
6.5.6.5 | Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 5 of 6 |
6.5.6.6 | Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 6 of 6 |
6.5.7.1 | Stage 1 Route Options with Material Assets - Agriculture Constraints Sheet 1 of 2 |
6.5.7.2 | Stage 1 Route Options with Material Assets - Agriculture Constraints Sheet 2 of 2 |
| Red 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
6.5.8.2 | Red 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
6.5.8.3 | Orange 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
6.5.8.4 | Orange 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
6.5.8.5 | Yellow 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
6.5.8.6 | Yellow 1 Route Option with Material Assets Non-Agricultural Properties Sheet 12of 2 |
6.5.8.7 | Blue 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
6.5.8.8 | Blue 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
6.5.8.9 | Pink 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
6.5.8.10 | Pink 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
6.5.8.11 | Green 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
6.5.8.12 | Green 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
6.5.8.13 | Stage 1 Route Options with Bord Gáis, HV ESB, SSE Constraints Sheet 1 of 2 |
6.5.8.14 | Stage 1 Route Options with Bord Gáis, HV ESB, SSE Constraints Sheet 2 of 2 |
6.5.9.1 | Stage 1 Route Options with Air Assessment Sheet 1 of 2 |
6.5.9.2 | Stage 1 Route Options with Air Assessment Sheet 2 of 2 |
6.5.10.1 | Stage 1 Route Options with Noise Constraints Sheet 1 of 2 |
6.5.10.2 | Stage 1 Route Options with Noise Constraints Sheet 2 of 2 |
6.5.11.1 | Stage 1 Route Options with Human Beings Constraints Sheet 1 of 2 |
6.5.11.2 | Stage 1 Route Options with Human Beings Constraints Sheet 2 of 2 |
7.1.1 | Stage 2 Route Options Plan Layout |
7.1.2 | Stage 2 Route Options - Schematic |
7.1.3 | Stage 2 Route Options Blue-Green Switch |
7.2.1.1 - 7.2.1.3 | 4th Environmental Workshop Display Sheets 1 to 3 |
7.2.2 | Stage 2 Blue Route Option - N6 Junction |
7.2.3 | Stage 2 Pink Route Option - N6 Junction |
7.2.4 | Stage 2 Green Route Option - N6 Junction |
7.2.5 | Stage 2 Red – Orange - Yellow Route Option - N6 Junction |
7.2.8.1 | AADT Locations - Red Option |
7.2.8.2 | AADT Locations - Orange Option |
7.2.8.3 | AADT Locations - Yellow Option |
7.2.8.4 | AADT Locations - Blue Option |
7.2.8.5 | AADT Locations - Pink Option |
7.2.8.6 | AADT Locations - Green Option |
7.3.1.0 | Online Route Option: RED Mainline Plan/Profile Key Plan |
7.3.1.1 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 1 of 9 |
7.3.1.2 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 2 of 9 |
7.3.1.3 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 3 of 9 |
7.3.1.4 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 4 of 9 |
7.3.1.5 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 5 of 9 |
7.3.1.6 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 6 of 9 |
7.3.1.7 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 7 of 9 |
7.3.1.8 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 8 of 9 |
7.3.1.9 | Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 9 of 9 |
7.3.2.0 | Stage 2 Orange Route Option - Mainline Plan/Profile Keyplan |
7.3.2.1 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 1 of 9 |
7.3.2.2 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 2 of 9 |
7.3.2.3 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 3 of 9 |
7.3.2.4 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 4 of 9 |
7.3.2.5 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 5 of 9 |
7.3.2.6 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 6 of 9 |
7.3.2.7 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 7 of 9 |
7.3.2.8 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 8 of 9 |
7.3.2.9 | Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 9 of 9 |
7.3.3.0 | Stage 2 Yellow Route Option - Mainline Plan/Profile Keyplan |
7.3.3.1 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 1 of 11 |
7.3.3.2 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 2 of 11 |
7.3.3.3 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 3 of 11 |
7.3.3.4 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 4 of 11 |
7.3.3.5 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 5 of 11 |
7.3.3.6 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 6 of 11 |
7.3.3.7 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 7 of 11 |
7.3.3.8 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 8 of 11 |
7.3.3.9 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 9 of 11 |
7.3.3.10 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 10 of 11 |
7.3.3.11 | Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 11 of 11 |
7.3.4.0 | Stage 2 Blue Route Option - Mainline Plan/Profile Keyplan |
7.3.4.1 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 1 of 10 |
7.3.4.2 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 2 of 10 |
7.3.4.3 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 3 of 10 |
7.3.4.4 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 4 of 10 |
7.3.4.5 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 5 of 10 |
7.3.4.6 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 6 of 10 |
7.3.4.7 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 7 of 10 |
7.3.4.8 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 8 of 10 |
7.3.4.9 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 9 of 10 |
7.3.4.10 | Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 10 of 10 |
7.3.5.0 | Stage 2 Pink Route Option - Mainline Plan/Profile Keyplan |
7.3.5.1 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 1 of 10 |
7.3.5.2 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 2 of 10 |
7.3.5.3 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 3 of 10 |
7.3.5.4 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 4 of 10 |
7.3.5.5 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 5 of 10 |
7.3.5.6 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 6 of 10 |
7.3.5.7 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 7 of 10 |
7.3.5.8 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 8 of 10 |
7.3.5.9 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 9 of 10 |
7.3.5.10 | Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 10 of 10 |
7.3.6.0 | Stage 2 Green Route Option - Mainline Plan/Profile Keyplan |
7.3.6.1 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 1 of 13 |
7.3.6.2 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 2 of 13 |
7.3.6.3 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 3 of 13 |
7.3.6.4 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 4 of 13 |
7.3.6.5 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 5 of 13 |
7.3.6.6 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 6 of 13 |
7.3.6.7 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 7 of 13 |
7.3.6.8 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 8 of 13 |
7.3.6.9 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 9 of 13 |
7.3.6.10 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 10 of 13 |
7.3.6.11 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 11 of 13 |
7.3.6.12 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 12 of 13 |
7.3.6.13 | Stage 2 Green Route Option - Mainline Plan/Profile Sheet 13 of 13 |
7.6.1.1 | Stage 2 Route Options and Annex I Habitats Sheet 1 of 8 |
7.6.1.2 | Stage 2 Route Options and Annex I Habitats Sheet 2 of 8 |
7.6.1.3 | Stage 2 Route Options and Annex I Habitats Sheet 3 of 8 |
7.6.1.4 | Stage 2 Route Options and Annex I Habitats Sheet 4 of 8 |
7.6.1.5 | Stage 2 Route Options and Annex I Habitats Sheet 5 of 8 |
7.6.1.6 | Stage 2 Route Options and Annex I Habitats Sheet 6 of 8 |
7.6.1.7 | Stage 2 Route Options and Annex I Habitats Sheet 7 of 8 |
7.6.1.8 | Stage 2 Route Options and Annex I Habitats Sheet 8 of 8 |
7.6.1.9 | Stage 2 Route Options and Bat Survey Results Sheet 1 of 4 |
7.6.1.10 | Stage 2 Route Options and Bat Survey Results Sheet 2 of 4 |
7.6.1.11 | Stage 2 Route Options and Bat Survey Results Sheet 3 of 4 |
7.6.1.12 | Stage 2 Route Options and Bat Survey Results Sheet 4 of 4 |
7.6.1.13 | Stage 2 Route Options and Other Species Sheet 1 of 4 |
7.6.1.14 | Stage 2 Route Options and Other Species Sheet 2 of 4 |
7.6.1.15 | Stage 2 Route Options and Other Species Sheet 3 of 4 |
7.6.1.16 | Stage 2 Route Options and Other Species Sheet 4 of 4 |
7.6.1.17 | Stage 2 Route Options and Annex I Habitats at Lough Corrib cSAC Crossing Sheet 1 of 2 |
7.6.1.18 | Stage 2 Route Options and Annex I Habitats at Lough Corrib cSAC Crossing Sheet 2 of 2 |
7.6.1.19 | Stage 2 Route Options with Wintering Bird Survey Sites Sheet 1 of 2 |
7.6.1.20 | Stage 2 Route Options with Wintering Bird Survey Sites Sheet 2 of 2 |
7.6.2.1 | Stage 2 Route Options with Soils & Geology Unique Constraints Sheet 1 of 2 |
7.6.2.2 | Stage 2 Route Options with Soils & Geology Unique Constraints Sheet 2 of 2 |
7.6.2.3 | Stage 2 Route Options with Solid Geology Sheet 1 of 2 |
7.6.2.4 | Stage 2 Route Options with Solid Geology Sheet 2 of 2 |
7.6.2.5 | Stage 2 Route Options with Soils Mapping Sheet 1 of 2 |
7.6.2.6 | Stage 2 Route Options with Soils Mapping Sheet 2 of 2 |
7.6.2.7 | Stage 2 Route Options with Subsoils Mapping Sheet 1 of 2 |
7.6.2.8 | Stage 2 Route Options with Subsoils Mapping Sheet 2 of 2 |
7.6.2.9 | Stage 2 Route Options with Soft Compressible Ground Sheet 1 of 2 |
7.6.2.10 | Stage 2 Route Options with Soft Compressible Ground Sheet 2 of 2 |
7.6.2.11 | Stage 2 Route Options with Principal Cuttings & Embankments Sheet 1 of 2 |
7.6.2.12 | Stage 2 Route Options with Principal Cuttings & Embankments Sheet 2 of 2 |
7.6.3.1 | Stage 2 Route Options with Hydrogeology Constraints Sheet 1 of 2 |
7.6.3.2 | Stage 2 Route Options with Hydrogeology Constraints Sheet 2 of 2 |
7.6.4.1 | Stage 2 Route Options with Hydrology Constraints - Drainage Catchments Sheet 1 of 2 |
7.6.4.2 | Stage 2 Route Options with Hydrology Constraints - Drainage Catchments Sheet 2 of 2 |
7.6.4.3 | Stage 2 Route Options with Flood Risk Mapping - Pluvial & Groundwater Sheet 1 of 2 |
7.6.4.4 | Stage 2 Route Options with Flood Risk Mapping - Pluvial & Groundwater Sheet 2 of 2 |
7.6.4.5 | Stage 2 Route Options with Flood Risk Mapping - Fluvial & Coastal Sheet 1 of 2 |
7.6.4.6 | Stage 2 Route Options with Flood Risk Mapping - Fluvial & Coastal Sheet 2 of 2 |
7.6.5.1 | Stage 2 Red Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
7.6.5.2 | Stage 2 Red Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
7.6.5.3 | Stage 2 Orange Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
7.6.5.4 | Stage 2 Orange Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
7.6.5.5 | Stage 2 Yellow Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
7.6.5.6 | Stage 2 Yellow Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
7.6.5.7 | Stage 2 Blue Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
7.6.5.8 | Stage 2 Blue Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
7.6.5.9 | Stage 2 Pink Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
7.6.5.10 | Stage 2 Pink Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
7.6.5.11 | Stage 2 Green Route Option with Landscape and Visual Assessment Sheet 1 of 2 |
7.6.5.12 | Stage 2 Green Route Option with Landscape and Visual Assessment Sheet 2 of 2 |
7.6.6.1 | Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 1 of 6 |
7.6.6.2 | Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 2 of 6 |
7.6.6.3 | Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 3 of 6 |
7.6.6.4 | Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 4 of 6 |
7.6.6.5 | Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 5 of 6 |
7.6.6.6 | Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 6 of 6 |
7.6.7.1 | Stage 2 Route Options with Material Assets - Agriculture Constraints Sheet 1 of 2 |
7.6.7.2 | Stage 2 Route Options with Material Assets - Agriculture Constraints Sheet 2 of 2 |
7.6.8.1 | Red 2 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
7.6.8.2 | Red 2 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
7.6.8.3 | Orange 2 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
7.6.8.4 | Orange 2 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
7.6.8.5 | Yellow 2 Route Options with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
7.6.8.6 | Yellow 2 Route Options with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
7.6.8.7 | Blue 2 Route Options with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
7.6.8.8 | Blue 2 Route Options with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
7.6.8.9 | Pink 2 Route Options with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
7.6.8.10 | Pink 2 Route Options with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
7.6.8.11 | Green 2 Route Options with Material Assets Non-Agricultural Properties Sheet 1 of 2 |
7.6.8.12 | Green 2 Route Options with Material Assets Non-Agricultural Properties Sheet 2 of 2 |
7.6.8.13 | Stage 2 Route Options with Bord Gáis/ESB/SSE Constraints Sheet 1 of 2 |
7.6.8.14 | Stage 2 Route Options with Bord Gáis/ESB/SSE Constraints Sheet 2 of 2 |
7.6.9.1 | Stage 2 Route Options with Air Assessment Sheet 1 of 2 |
7.6.9.2 | Stage 2 Route Options with Air Assessment Sheet 2 of 2 |
7.6.10.1 | Noise Contour Maps Red Route Lden Noise Contour Plot |
7.6.10.2 | Noise Contour Maps Orange Route Lden Noise Contour Plot |
7.6.10.3 | Noise Contour Maps Yellow Route Lden Noise Contour Plot |
7.6.10.4 | Noise Contour Maps Blue Route Lden Noise Contour Plot |
7.6.10.5 | Noise Contour Maps Pink Route Lden Noise Contour Plot |
7.6.10.6 | Noise Contour Maps Green Route Lden Noise Contour Plot |
7.6.11.1 | Stage 2 Route Options with Human Beings Constraints Sheet 1 of 2 |
7.6.11.2 | Stage 2 Route Options with Human Beings Constraints Sheet 2 of 2 |
7.6.12.1& 7.6.12.2 | Stage 2 Route Options with Land Use Map Sheets 1 to 2 |
7.8.1 | Emerging Preferred Route Corridor |
7.8.2 | Stage 2 Route Options with Preferred Route Option Plan Layout |