RFI Volume 4 – Appendix A.10.1 Design Report (DR)
Home | Further Information | Volume 1 | Volume 2 | Volume 3 | Volume 4 |
Volume 2A
1.GCOB-000-D-000 to 015 | Aerial Mapping |
2. GCOB-100-D-000 | Key Plan |
3. GCOB-100-D-001 to 015 | Scheme Layout – OS Mapping |
4. GCOB-100-D-100 | Key Plan |
5. GCOB-100-D-101 to 111 | Mainline Plan / Profile |
6. GCOB-100-D-200 | Key Plan |
7. GCOB-100-D-201 to 221 | Sideroads Plan / Profile |
8. GCOB-100-D-300 to 304 | Typical Cross Sections |
9. GCOB-100-D-400 |
Key Plan |
10. GCOB-100-D-401 to 408 | Traffic Diversions and Road Closures |
11. GCOB-100-DP-100 | Key Plan |
12. GCOB-100-DP-101 to 111 | Mainline Departures and Relaxations |
13. GCOB-100-DP-200 to 223 | Sideroads Departures and Relaxations |
14. GCOB-100-DP-301 to 302 | Tunnel Typical Cross Section |
15. GCOB-100-DP-400 to 404 | Aquaplaning Assessment Contours |
16. GCOB-300-D-000 to 015 | Fencing and environmental barriers |
17. GCOB-300-D-101 | Otter fencing details |
18. GCOB-400-D-000-KeyPlan | Key Plan |
19. GCOB-400-D-001 to 015 | Vehicle restraint systems |
20. GCOB-500-D-000 | Key Plan |
21. GCOB-500-D-001-015 | Drainage network catchment layout |
22. GCOB-500-D-100 | Key Plan |
23. GCOB-500-D-101-132 | Drainage layout |
24. GCOB-500-D-301-301 | General arrangement – ponds and pollution control |
25. GCOB-500-D-400-402 | Drainage - rising main plan/profile |
26. GCOB-500-D-500-514 | Section 50 application drawings – layout |
27. GCOB-500-D-515-523 | Section 50 application drawings - culvert details |
28. GCOB-500-D-600 | N83 Tuam Road flood relief measures |
29. GCOB-600-D-100-115 | Preliminary ground investigation location layout |
30. GCOB-600-D-201-212 | Ground investigation plan/profile |
31. GCOB-600-D-301 | Galway racecourse - groundwater sealing details |
32. GCOB-600-D-401 | Barn owl tree planter |
33. GCOB-700-D-000 to 015 | Pavement Layout |
Volume 2B
34. GCOB-1100-D-000 to 015 | Kerbs, footways, and paved areas |
35. GCOB-1200-D-000 to 015 | Traffic Signs and Road Markings |
36. GCOB-1300-D-000 to 015 | Lighting |
37. GCOB-1400-D-000 to 015 | Electrical |
38. GCOB-1500-D-000 to 015 | Information and Communication Technology |
39. GCOB-1700-D-GEN-001_I4 | Standard Underbridges Type 1 |
40. GCOB-1700-D-GEN-002_I5 | Standard Underbridges Type 2A |
41. GCOB-1700-D-GEN-003_I5 | Standard Underbridges Type 2B |
42. GCOB-1700-D-GEN-004_I5 | Standard Underbridges Type 3 |
43. GCOB-1700-D-GEN-011_I4 | Culverts and underpasses - buried box and arch structures |
44. GCOB-1700-D-S01-01-001_I2 | Standard overbridge structure - S01/01 |
45. GCOB-1700-D-S01-01-002_I2 | Standard overbridge structure - S01/01 – parapet barrier layout |
46. GCOB-1700-D-S03-01-001_I3 | Standard overbridge structure - S03/01 |
47. GCOB-1700-D-S03-01-002_I2 | Standard overbridge structure S03/01 - parapet barrier layout |
48. GCOB-1700-D-S08-04-001-004_I3_I4 | Structure S08-04 River Corrib Bridge |
49. GCOB-1700-D-S10-01-001_I7 | S10-01 Menlough Viaduct sheet 1 |
50. GCOB-1700-D-S10-01-002_I6 | S10-01 Menlough Viaduct sheet 2 |
51. GCOB-1700-D-S11-01-001_I3 | Lackagh tunnel & western approach - general plan and profile |
52. GCOB-1700-D-S11-01-011_I4 | Lackagh tunnel & western approach - mined tunnel general arrangement |
53. GCOB-1700-D-S11-01-013_I3 | Lackagh tunnel & western approach - tunnel temp support details |
54. GCOB-1700-D-S11-01-020_I3 | Lackagh tunnel & western approach - western approach plan |
55. GCOB-1700-D-S11-01-021_I3 | Lackagh tunnel & western approach - western approach sheet 1 of 4 |
56. GCOB-1700-D-S11-01-022_I4 | Lackagh tunnel & western approach - western approach sheet 2 of 4 |
57. GCOB-1700-D-S11-01-023_I4 | Lackagh tunnel & western approach - western approach sheet 3 of 4 |
58. GCOB-1700-D-S11-01-024_I3 | Lackagh tunnel & western approach - western approach sheet 4 of 4 |
59. GCOB-1700-D-S11-01-025_I4 | Lackagh tunnel & western approach to Lackagh tunnel |
60. GCOB-1700-D-S11-01-026_I3 | Lackagh tunnel & western approach - typical details |
61. GCOB-1700-D-S11-01-027_I3 | Lackagh tunnel & western approach - proposed sump layout |
62. GCOB-1700-D-S11-01-030_I2 | Lackagh tunnel - eastern approach plan and elevation |
63. GCOB-1700-D-S11-01-040_I2 | Lackagh tunnel - western approach and eastern approach plan |
64. GCOB-1700-D-S12-02-001_I3 | Standard overbridge structure S12/02 |
65. GCOB-1700-D-S13-01-001_I3 | Standard overbridge structure S13/01 |
66. GCOB-1700-D-S13-01-002_I2 | Standard overbridge structure - S13/01 - parapet/safety barrier layout |
67. GCOB-1700-D-S14-01-001_I3 | Standard overbridge structure - S14/01 |
68. GCOB-1700-D-S14-01-002_I2 | Standard overbridge structure - S14/01 - parapet/safety barrier layout |
69. GCOB-1700-D-S14-02-001_I4 | S14-02 Galway racecourse tunnel - plan, profile, & section |
70. GCOB-1700-D-S14-02-002_I3 | S14-02 Galway racecourse tunnel - tunnel portal |
71. GCOB-1700-D-S14-02-003_I3 | S14-02 Galway racecourse tunnel - utilities at south east portal |
72. GCOB-1700-D-S16-01-001_I3 | Standard overbridge structure - S16/01 |
73. GCOB-1700-D-S16-01-002_I2 | Standard overbridge structure - S16/01 – parapet layout |
74. GCOB-1700-D-S16-02-001_I3 | Standard overbridge structure - S16/02 |
75. GCOB-1700-D-S16-02-002_I2 | Standard overbridge structure - S16/02 - parapet layout |
76. GCOB-1700-D-C09-1 to 5-001-002_I3 | Culverts and underpasses - Structure C09/01 to 05 Sheet 1 & 2 |
77. GCOB-1700-D-C10-01-001_I3 | Culverts and underpasses - Structure C10/01 |
78. GCOB-2700-D-000-KeyPlan | Key Plan |
79. GCOB-2700-D-001 to 015 | Existing ESB, gas & telecom utilities network plan |
80. GCOB-2700-D-100-KeyPlan | Key Plan |
81. GCOB-2700-D-101 to 115 | Accommodation works plan |
82. GCOB-2700-D-200-KeyPlan | Key Plan |
83. GCOB-2700-D-201-240 | Eir diversion requirements |
84. GCOB-2700-D-250-KeyPlan | Key Plan |
85. GCOB-2700-D-251-256 | Gas diversion requirements |
86. GCOB-2700-D-260-Keyplan | Key Plan |
87. GCOB-2700-D-261-275 | Enet diversion requirements |
88. GCOB-2700-D-280-Keyplan | Key Plan |
89. GCOB-2700-D-281-287 | ESBI diversion requirements |
90. GCOB-2700-D-290-Keyplan | Key Plan |
91. GCOB-2700-D-291-309 | ESB 38kv diversion requirements |
92. GCOB-2700-D-310-Keyplan | Key Plan |
93. GCOB-2700-D-311-331 | Public sewers |
94. GCOB-2700-D-340-Keyplan | Key Plan |
95. GCOB-2700-D-341-346 | Virgin media diversion requirements |
96. GCOB-2700-D-350-Keyplan | Key Plan |
97. GCOB-2700-D-351-354 | SSE diversion requirements |
98. GCOB-2700-D-360-Keyplan | Key Plan |
99. GCOB-2700-D-361-396 | ESB MV/LV diversion requirements |
100. GCOB-2700-D-400-Keyplan | Key Plan |
101. GCOB-2700-D-401-440 | Watermain diversion requirements |
102. GCOB-2700-D-450-KeyPlan | Key Plan |
103. GCOB-2700-D-451-452 | Telecommunication tower diversion requirements |
104. GCOB-2700-D-460-KeyPlan | Key Plan |
105. GCOB-2700-D-461-467 | BT diversion requirements |
106. GCOB-3000-D-001 to 003 | Proposed bat roosts |
107. GCOB-3000-D-004 to 006 | Artificial bat roosts location plan |
108. GCOB-3000-D-102 | NUIG pitch lighting |
109. GCOB-3000-D-103 | NUIG pitch construction detail |
110. GCOB-3000-D-104 | NUIG construction phase accessibility plan |
111. GCOB-3000-D-200 to 209 | Tunnel service buildings Sheets 1 to 10 |
112. GCOB-3000-D-210 to 214 | Tunnel service buildings Sheets 11 to 15 |
113. GCOB-3000-D-215 to 216 | Tunnel service buildings Sheets 16 to 17 |
114. GCOB-3000-D-221 to 227 | NUIG sports pavilion |
115. GCOB-3000-D-300 to 315 | Galway Racecourse tunnel construction sequencing |
116. GCOB-3000-D-350 to 351 | Proposed mitigation drainage plan Galway Racecourse stable yards |
117. GCOB-3000-D-360 | Proposed mitigation lighting plan Galway Racecourse stable yards |
118. GCOB-3000-D-361 to 367 | Autotrack alignment Galway Racecourse |
119. GCOB-3000-D-370 | Proposed mitigation landscaping plan Galway Racecourse stable yards |
DR Volume 3 – Appendices
Volume 3A
A.2.1 | Traffic Modelling Report |
A.2.2 | Project Brief |
A.2.3 | Outcome of Peer Review Process + Design Team Response |
A.2.4 | Project Appraisal Audit |
A.2.5 | DPER Technical Appraisal Review |
A.3.1 | Departures Approvals |
A.3.2 | Safety Barrier Schedules |
A.3.3 | N84 to N17 Weave Merge Calculations |
A.3.4 | Design Risk Assessments |
A.4.1 | Junction Strategy Report |
Volume 3B
A.5.1.1 | Section 1 of 4 - Ground Investigation Reports |
A.5.1.1.1 | N6 Galway City Outer Bypass Contract 1 Menlough to Garraun North |
A.5.1.1.2 | N6 Galway City Outer Bypass Contract 2 Gortatleva to Menlough |
A.5.1.1.3 | N6 Galway City Outer Bypass Contract 3 Menlough to Garraun North |
A.5.1.1.4 | N6 Galway City Outer Bypass Detailed Design Ground Investigation |
A.5.1.2 | Phase 1 Contract 1 July 2014 |
A.5.1.3 | Phase 2 Contract 1 October 2015 to November 2015 (First part) |
Volume 3C
A.5.1.1 | Section 2 of 4 - Ground Investigation Reports |
A.5.1.3 | Phase 2 Contract 1 October 2015 to November 2015 (Second part) |
A.5.1.4 | Phase 3 Contract 1 January to April 2016 (First part) |
Volume 3D
A.5.1.1 | Section 3 of 4 - Ground Investigation Reports |
A.5.1.4 | Phase 3 Contract 1 January to April 2016 (Second part) |
A.5.1.5 |
Phase 3 Contract 2 October 2015 to January 2016 (First part) |
Volume 3E
A.5.1.1 | Section 4 of 4 - Ground Investigation Reports |
A.5.1.5 | Phase 3 Contract 2 October 2015 to January 2016 (Second part) |
A.5.1.6 | Phase 3 Contract 3 November to December 2016 |
Volume 3F
A.5.2 | Geotechnical Summary Table – Earthworks Areas |
A.5.3.1 | Karst Survey |
A.5.3.2 | Karst Protocol |
A.5.4 | Geotechnical Figures: Ground Investigation laboratory test results |
A.5.5 | Blasting |
A.5.5.1 | Blast Feasibility and Exclusion Requirements Note |
A.5.5.2 | Potential blasting locations during construction |
Volume 3G
A.7.1 | Standard Overbridges PDR |
A.7.2 | Standard Underbridges PDR |
A.7.3 | Galway Racecourse Tunnel PDR |
A.7.4 | Menlough Viaduct PDR |
A.7.5 | Lackagh Tunnel PDR |
A.7.6 | River Corrib Bridge PDR |
A.7.7 | Culverts and Underpasses PDR |
A.7.8 | Other Structures PDR |
Volume 3H
A.8.1 | Section 50 Report & Consent |
A.8.2 | HD45 Groundwater Protection Response Assessment |
A.8.3 | Pre Earthworks Drainage Schedules |
A.8.4 | Pump Station Preliminary Sizing |
A.8.5 | Network Drainage Schedules |
A.8.6 | Flood Risk Assessment |
A.8.7 | Pre Connection Enquiry Feedback |
A.14.1 | Road Safety Audit Stage F Part 2 |
A.14.2 | Road Safety Audit Stage 1 |
A.15.1 | CBA Report |
A.16.1 | Galway Racecourse Stable Yard – Architectural Details |